The Principality of Monaco has embarked on the construction of a new state-of-the-art hospital (37,000m² for the 1st phase, 82,000 m² in total).
SXD is working for Eiffage Énergie Systèmes (high voltage) and INEO PACA (low voltage) and facilitates the interface between these two lots.
SXD performsBIM modelingof all high and low voltage systems,participates in synthesis (spatial coordination between lots) andproduces the drawings required to complete the work.
This involves taking into account tens of thousands of objects spread over 16 floors, integrating multiple modifications.
This painstaking work is accomplished on a daily basis thanks to advanced mastery of modeling tools and innovations.